Installed Christmas gifts this weekend
I installed my Christmas gifts this weekend. Spyder bumper, recon 10,500 lb winch, 5000 lumans LED light bar, 1.5 spacers and disconnects.
It took me 2 days to get it all done by myself. The only problem I ran in to was when I went to put on the bumper two holes didnt line up. No big deal
just redriledl the holes bigger. Before I started I measured from the bottom of the finder to the to the floor got 35". After I put the lift on I measured again and got 39"s. Installed bumper and winch and got 38.5". Iam really happy with the way it went. Now all I need to do is figure out the tires I want.


It took me 2 days to get it all done by myself. The only problem I ran in to was when I went to put on the bumper two holes didnt line up. No big deal
just redriledl the holes bigger. Before I started I measured from the bottom of the finder to the to the floor got 35". After I put the lift on I measured again and got 39"s. Installed bumper and winch and got 38.5". Iam really happy with the way it went. Now all I need to do is figure out the tires I want.



