My '08 Red Rock 2 Dr. X build
#114
JK Super Freak
Thread Starter
Join Date: Jun 2011
Location: Elizabethtown, PA
Posts: 1,206
Likes: 0
Received 0 Likes
on
0 Posts
Originally Posted by StoneMill
The silver acts like reflectors and makes your fogs twice as bright.
#117
JK Super Freak
Thread Starter
Join Date: Jun 2011
Location: Elizabethtown, PA
Posts: 1,206
Likes: 0
Received 0 Likes
on
0 Posts
I'm back to the waiting game so I can add my spare. I have to get a few pieces powder coated yet. Hopefully I'll have time to run them over on Monday along with my nerf bars.
#118
JK Super Freak
Thread Starter
Join Date: Jun 2011
Location: Elizabethtown, PA
Posts: 1,206
Likes: 0
Received 0 Likes
on
0 Posts
I ordered D-rings, isolators, and Daystar hood wranglers today. Just about through my budget now. Doh!! I still have a couple of things left to do. I'm going to take my time and savor it as I'm pretty sure I won't see this kind of frivolity again for quite some time.
I still have to install the front DS, and install the rest of the grade 8 bolts, but I'm waiting until StoneMill gets his benwill lift up and running for that.
I also need to clean my throttle body, and replace my PVC valve. I'm also going to feed the engine Royal Purple 10-30 for the next oil change in hopes of reducing the amount of oil it gobbles up. Then tranny and transfer case need done.
I still have to finish up the tire carrier and get license plate mounted and lighting wired. I'm in the process of making plates for behind the spyder emblems in the bumpers but they need trimmed up a bit before I start painting them.
Then I'll have to live vicariously through StoneMill while we work on his rig. I never thought I'd enjoy turning a wrench this much.
Jeep madness!!
I still have to install the front DS, and install the rest of the grade 8 bolts, but I'm waiting until StoneMill gets his benwill lift up and running for that.
I also need to clean my throttle body, and replace my PVC valve. I'm also going to feed the engine Royal Purple 10-30 for the next oil change in hopes of reducing the amount of oil it gobbles up. Then tranny and transfer case need done.
I still have to finish up the tire carrier and get license plate mounted and lighting wired. I'm in the process of making plates for behind the spyder emblems in the bumpers but they need trimmed up a bit before I start painting them.
Then I'll have to live vicariously through StoneMill while we work on his rig. I never thought I'd enjoy turning a wrench this much.
Jeep madness!!
Last edited by Xman4602; 04-09-2012 at 10:32 PM.
#119
JK Enthusiast
Join Date: Dec 2009
Location: Lebanon, PA
Posts: 344
Likes: 0
Received 0 Likes
on
0 Posts
Soon. I a plywood board and my sub box. Feeder cable and romex are on order. I've got 20 sheets of osb sitting in the front garage to start covering the walls and lots of tools to organize. Emailed about my decal idea. Hopefully get prices next week.
#120
JK Super Freak
Thread Starter
Join Date: Jun 2011
Location: Elizabethtown, PA
Posts: 1,206
Likes: 0
Received 0 Likes
on
0 Posts