Mygig Available Nov 1
I know I have 2 XM radio's now. Looks like I'll be learning to like Sirius. The XM are portable so when I ride my bike or walk I have XM and wheeling will be Sirius. The best of both worlds. That is if DC ever releases the MyGig.
MyGig is still not available for order. I also checked into the parts and it does not show that it is available for the dealer to order yet either.
It could come online as an order option at any time or day. But that also means that it could be today or it could be the 18th of December. They still show the 18th as the Job 1 date, so they would need to release the option on the order system a couple weeks before hand at minimum. That is of course if they do not try and push teh date back again.
It could come online as an order option at any time or day. But that also means that it could be today or it could be the 18th of December. They still show the 18th as the Job 1 date, so they would need to release the option on the order system a couple weeks before hand at minimum. That is of course if they do not try and push teh date back again.
No problem. If there is ever a question on the forums that I miss please let me know. I usually don't have enough time to monitor all the thread, especially as this site grows.
Thanks
Don A Vee- Can you see if the Mygig is available in the online parts catalog now? My JK went to D last Tuesday, so the only I shot I have to get the system is if I can order it through parts. I want to roll it up into the full Price of the JK.
BTW- If I am in D status, and I have Dec allocation, and my dealer has allocation available, should my JK be built on the 29th of Nov?
BTW- If I am in D status, and I have Dec allocation, and my dealer has allocation available, should my JK be built on the 29th of Nov?
The MyGig part number does show up in the parts inquiry system, but there are 0 units available in the entire US distribution system.
The factory does shut down for a period of 1-2 weeks during Christmas/New Year.
The factory does shut down for a period of 1-2 weeks during Christmas/New Year.
MyGig is still not available for order. I also checked into the parts and it does not show that it is available for the dealer to order yet either.
It could come online as an order option at any time or day. But that also means that it could be today or it could be the 18th of December. They still show the 18th as the Job 1 date, so they would need to release the option on the order system a couple weeks before hand at minimum. That is of course if they do not try and push teh date back again.
It could come online as an order option at any time or day. But that also means that it could be today or it could be the 18th of December. They still show the 18th as the Job 1 date, so they would need to release the option on the order system a couple weeks before hand at minimum. That is of course if they do not try and push teh date back again.
I would sure like to order this option if I have not gone to "D" status yet.



Thanks again.